Case Study

new powder Coating Formula Fixes line shutdown

When the switch to a new powder supplier caused a line shutdown, our expert CPI Solution Squad worked with the new supplier to develop and test a new powder coating formula. This customized formula was then validated on the customer’s production line, getting them back up and running and cutting costs with newer, less expensive powder.

Industry

Agricultural

Product

Pretreatment

Location

Illinois, United States

Problem

Our customer was switching powder suppliers and the torques were turned off. The bolts spun out of control while applying the new powder, resulting in line shut down and the customer having to switch back to a more expensive powder.

Action

The CPI Solution Squad began working with the new supplier to develop and test a new powder coating formula.

Result

A customized formula was developed to meet the customer’s torque requirements and they were able to switch a newer, less expensive powder, resulting in lower production costs.

Need to Solve a Problem?

Or click here to return to Case Studies