Technical Q&A

What’s causing inconsistent adhesion on our coated parts, even though the surface was pretreated?

The short answer

Inconsistent adhesion usually points to a breakdown in cleaning, coating, or process control. Here’s what to look for:

  • Clean thoroughly. Oils, stamping lubes, or corrosion inhibitors left on the surface can block pretreatment from bonding. Make sure your cleaner is built for your soil load, and that your rinse stages aren’t just moving contaminants downstream.
  • Evaluate your pretreatment chemistry. Zirconium and phosphate coatings both rely on tight control of pH, temperature, and dwell time. If you’re outside the recommended range, even slightly, you can end up with undercoating or uneven film build.
  • Check for substrate mismatch. Some chemistries behave differently on cold-rolled steel, aluminum, and Galvanneal. If you’re running mixed metals without the right formulation, one of them may be under-reacting.
  • Look at line timing and part handling. Short dwell times, long dry-off periods, or dirty gloves during handling can all cause adhesion issues, even if your chemistry is spot on.

Adhesion issues aren’t random. They’re traceable. Surface prep, chemistry, handling… it all leaves a trail.

Follow it, and you should find the fix.

Not sure which one you’re dealing with → Talk to the Solution Squad about it

Related Questions

Why does phosphate pretreatment create compliance headaches?

Phosphate pretreatment creates compliance work in four places: phosphorus in the wastewater, regulated metals like zinc and nickel, sludge that has to be characterized and hauled, and the water used by multistage rinses. The cost is spread across water bills, waste hauling, permits and staff time.

Why do parts flash rust between stages, and how do I stop it?

Flash rust is rapid oxidation that forms on bare steel when iron, oxygen and water meet, sometimes within minutes. It usually comes from one of five causes: parts drying mid-process, high washer temperatures, water impurities, acidic pH or uneven chemical coverage. Start by checking whether parts dry between stages, then look at water, pH and spray pattern.

How does zirconium prevent sludge in the bath?

Phosphate baths form crystals that drop insoluble solids, which build up as sludge on tank floors, heating elements and nozzles. Zirconium pretreatment forms a thin nanoceramic oxide layer on the part and produces no heavy sludge. That means fewer boil-outs, less nozzle scale and lower waste hauling costs.

Can’t find what you need?

Our Solution Squad is here to help you find the answer.

Ask the Solution Squad
Did this answer your question? Not quite