Sprinkler Break Shuts Down Powder Coating Line Production
By using a workaround solution, our expert CPI Solution Squad prevented a powder coating line shutdown by bypassing a broken agricultural sprinkler head. This resulted in no production downtime for the customer and prevented production loss.
Industry
Agriculture
Product
Pretreatment
Location
Illinois, United States
![](https://circleprosco.com/wp-content/uploads/2022/08/problem.png)
Problem
Production was shut down due to a broken sprinkler head in the yellow powder booth. The booth needed to be cleaned and reworked.
![](https://circleprosco.com/wp-content/uploads/2022/08/action.png)
Action
The CPI Solution Squad created a work around to enable yellow powder to flow around the shop to prevent powder coating line shutdown while the booth was being recovered.
![](https://circleprosco.com/wp-content/uploads/2022/08/result.png)
Result
The Solution Squad prevented further production loss by implementing a workaround solution.