Case Study

Seasonal Variations Cause Issues With Solvent Packaging And Flash Times

Seasonal variations caused issues with solvent packages and flash times for a customer’s pretreatment process. Our experts leveraged their knowledge and experience to develop a solution that reduced cycle time and increased production output.

Industry

Agriculture

Product

Pretreatment

Location

Illinois, United States

Problem

An agricultural equipment manufacturer was experiencing delay times due to frequent changes in weather, which were causing solvent packaging and flash time to change almost every day, impacting production times

Action

The CPI Solution Squad developed summer and winter solvent packaging, designed to address weather specific conditions. The Squad also added a pretreatment process that used a wet-on-wet application that eliminated the need to use the oven after the primer.

Result

The customer experienced less production line downtime and was able to increase production output.

Need to Solve a Problem?

Or click here to return to Case Studies